Nails
MenuMENU
SearchSEARCH

Finishing Touches

We passed the sprinkler inspection; our elevator inspection is on Monday. (We’ve already fixed the circuit board that blew out.) The salon was originally scheduled to get gas today, but the plumber installed a pipe incorrectly

by NAILS Magazine
September 19, 2008
1 min to read


We passed the sprinkler inspection; our elevator inspection is on Monday. (We’ve already fixed the circuit board that blew out.) The salon was originally scheduled to get gas today, but the plumber installed a pipe incorrectly and it has to be moved, so now we should get gas and hot water on Monday.


Salon STX is up and running. We’re now inputting all of the salon’s inventory, setting up our retail displays, and just getting the products up and out. One product we’ll be carrying is Elixr Tonics. These blends can be mixed with sparkling or flat water to create a refreshing, healthy beverage. We’ll be offering this as a drink during all of our services.

Ad Loading...


I’m really excited about some artwork that’s on order and should arrive in November all the way from Switzerland. It’s actually a gift from my dad to the salon. It’s by an artist named Nicole Hassler, who does artwork using actual OPI lacquer and brushes. (She approached my dad at a tradeshow in Europe). My dad is going to be her U.S. distributor.


Also, we have a soft opening date: Oct. 10.

Subscribe to Our Newsletter

More Blog Posts

Ad Loading...
Ad Loading...

Not Good at Saying No

Where to start...where to start...well, let's start with: Why start over? When I graduated from nail school I was immediately hired at a busy full-service salon, and I started working hard to build a clientele. I

by NAILS Magazine

Crystal's Bio

Last year I was a busy nail tech in a small town, completely content in what I was doing, trying to advance myself and set myself apart with the competition in my area. Had you asked

by NAILS Magazine
Ad Loading...